Commercial ScaffoldingSwansea SA12024

Swansea Waterfront Development

Full perimeter access scaffolding for a six-storey mixed-use development on Swansea's SA1 waterfront. Complex loading calculations required due to proximity to tidal waters.

Custom cantilever design over tidal zone
Weekly CISRS inspection records maintained
Highway scaffold licence managed by us
Site established in 3 days
PROJECT DATA
LOCATIONSwansea SA1
TYPECommercial Scaffolding
DURATION14 weeks
SCOPE6-storey perimeter
VALUE£48,000
STATUSActive
Commercial ScaffoldingNeath SA112024

Neath Town Centre Refurb

Complete façade access scaffolding for the refurbishment of a grade-II listed commercial building in Neath town centre. Full pavement scaffold with pedestrian protection.

Listed building consent coordinated
Pedestrian protection throughout
Town centre pavement licence managed
Heritage-grade ties installed
PROJECT DATA
LOCATIONNeath SA11
TYPECommercial Scaffolding
DURATION8 weeks
SCOPEFull elevation access
VALUE£22,000
STATUSCompleted
Domestic ScaffoldingLlanelli SA152024

Llanelli Residential Estate

Phased re-roofing scaffold programme for a 48-unit residential estate in Llanelli. Coordinated access across 6 phases to keep disruption to residents to an absolute minimum.

Phased 6-stage delivery programme
Resident communication managed
All units scaffolded and struck in sequence
Zero neighbour complaints logged
PROJECT DATA
LOCATIONLlanelli SA15
TYPEDomestic Scaffolding
DURATION24 weeks
SCOPE48 units — phased
VALUE£96,000
STATUSActive
Industrial ScaffoldingPort Talbot SA122023

Margam Industrial Maintenance

Full maintenance access scaffolding for an industrial facility in the Margam area. Specialist scaffolding design to accommodate existing plant and machinery.

Specialist industrial risk assessment
Confined space working protocols
Coordinated with production schedule
Night shift erection to minimise downtime
PROJECT DATA
LOCATIONPort Talbot SA12
TYPEIndustrial Scaffolding
DURATION6 weeks
SCOPEIndustrial maintenance access
VALUE£34,000
STATUSCompleted
Temporary Roof SystemBridgend CF362023

Porthcawl Heritage Re-Roof

Full 18m-span temporary roof structure over a Victorian terraced property in Porthcawl. Installed prior to complete roof strip and replacement during winter months.

18m clear span temporary roof system
Winter weather protection guaranteed
Victorian heritage property protocols
Structural engineer sign-off obtained
PROJECT DATA
LOCATIONBridgend CF36
TYPETemporary Roof System
DURATION10 weeks
SCOPEFull temporary roof — 18m span
VALUE£28,500
STATUSCompleted
Emergency ScaffoldingSwansea SA22024

Swansea Storm Emergency

Emergency structural exclusion zone erected following storm damage to a chimney and partial roof failure. On-site within 4 hours, with emergency certificate issued.

On site in under 4 hours at 11pm
Emergency structural assessment supported
Insurance claim documentation prepared
Permanent scaffold erected within 24 hours
PROJECT DATA
LOCATIONSwansea SA2
TYPEEmergency Scaffolding
DURATION4 hours response
SCOPEStructural exclusion zone
VALUE£8,200
STATUSCompleted
Scaffolding detail
READY TO START?

We respond in
under 4 hours.

No call centres. No automated systems.
You speak directly to a contracts manager.

01792 555 999
OR
CISRS CERTIFIEDFULLY INSUREDSAME-DAY RESPONSE24/7 EMERGENCY
CALL NOWGET QUOTE